Skip to main content
ZhixinPaper paper and label production facility with manufacturing equipment
50,000 m2 · Xi'an, China
Paper and Label Manufacturing

Manufacturing Capabilities

20+ production lines and 500m+ rolls/year rated capacity. rated production capacity; actual output depends on product mix, specifications, and production schedule. FCL timing is confirmed by product, material, and production-slot availability.

Specification ReviewBatch Records

50,000 m2

Factory Area

20+

Production Lines

500M+

Annual Output

By Order

FCL Loading Schedule

Our Facility

World-Class
Manufacturing

Our 50,000 m2 facility houses 20+ production lines with 500m+ rolls/year rated capacity; rated production capacity; actual output depends on product mix, specifications, and production schedule. Batch traceability scope and retained records are confirmed for the applicable product, specification, and order quality plan.

50,000 m2
Factory Area
20+
Production Lines
500M+ Rolls/Year Rated Capacity
Annual Output
800+
Employees
Production scheduling based on order and line availability
German and Japanese coating equipment
Order-specific batch records and traceability scope
In-house material testing capabilities
Climate-controlled production zones
Quality-management evidence available for buyer review
Thermal Paper Coating Production LineFactory Aerial View
How We Make It

6-Step Production Process

From raw material review to container-ready packing, controls and records are defined by the approved specification and order quality plan.

01

Raw Material Inspection

Incoming materials are reviewed and tested when required by the approved product specification and order quality plan.

02

Thermal Coating

Coating parameters are set and monitored against the applicable product specification and process plan.

03

Drying & Curing

Multi-zone drying settings are controlled to support the specified coating and thermal-performance requirements.

04

Slitting & Cutting

Rolls are converted to the confirmed dimensions; order tolerances and acceptance criteria are documented in the approved specification.

05

Quality Inspection

Inspection method, sampling plan, and acceptance criteria follow the approved product specification and order quality plan.

06

Packing & Loading

OEM or standard packaging. 3-5 Business Days applies for confirmed standard-product orders with materials and production slots available; custom orders require schedule confirmation.

Equipment

German & Japanese Precision Machinery

Equipment capabilities and process controls are matched to the applicable product specification and order quality plan.

Coating Machine

Germany

2.5m working width; process settings confirmed by product specification

4 units

Slitting Machine

Japan

Maximum rated speed 1,200 m/min; order tolerance confirmed by specification

12 units

Rewinding Machine

Taiwan

Auto tension control, 0–200mm core

8 units

Lab Testing Equipment

Germany

Thermal sensitivity, image density, whiteness

Full suite
Quality Control

Pre-Shipment Inspection by Quality Plan

Inspection scope, sampling frequency, acceptance criteria, and report availability are confirmed against the approved specification and order requirements.

Thermal sensitivity (print darkness at standard temperature)
Image stability (resistance to heat, light, and moisture)
Roll length acceptance criteria defined in the approved specification
Width tolerance confirmed for the applicable product and order
Core size and paper thickness
BPA or phenol testing when required for the applicable material or batch
Packaging integrity and labeling accuracy
Certifications & Compliance

Internationally Recognized Standards

ISO 9001:2015
Management system certificate
Current certificate copy available upon request
FSC chain of custody
Chain-of-custody certificate
Confirm product eligibility and claim wording before order
BPA / phenol testing
Third-party test report
Relevant reports can be requested by product specification
RoHS documentation
Supplier declaration
Confirm applicability to the destination market and product
REACH / SVHC documentation
Regulatory reference
Current declaration available for applicable specifications
CE applicability
Conformity declaration
Applicability must be confirmed for the specific product

Ready to Place a Bulk Order?

Our team responds within 24 hours after we receive complete product specifications, quantity, packaging, and destination details. Product feasibility, pricing, and the production schedule are confirmed in the quotation.